Skip to content

Mill Pond

Client

Mill Pond

Location

1 Cemetery Street, Norwalk, CT

Services Provided

Land Surveying and Site Civil Engineering

The East Avenue Village District’s first project, Mill Pond, will significantly enhance the area. Replacing a largely vacant parking lot with a beautiful streetscape thanks to new zoning regulations intended to breathe new life into the East Norwalk TOD Zone. As part of the Spinnaker and Beinfield Architecture team, Redniss & Mead serves as the lead land surveyors and civil engineers. We are enabling this transformation by designing the site and surrounding street improvements to support the mixed-use development – residential apartments alongside commercial space – despite the challenging location and floodplain. Our contribution included grading, drainage, utility plans, and sediment and erosion control plans, all crucial for navigating the entitlement process and securing approvals from Planning & Zoning. Additionally, the development required local Coastal Area Management site plan approval, along with collaboration with the Department of Public Works, the Water Pollution Control Authority, and TMP (Transportation, Mobility, and Parking). Mill Pond will set a new standard for future development in the area.