Greenwich Project: Benedict Place: Delivering Affordable Housing the Right Way in Downtown Greenwich

Affordable housing in Greenwich often arrives with tension.

At 19 Benedict Place, it arrived differently.

Benedict Place is a 120-unit multifamily development in downtown Greenwich, with 48 units designated as affordable under Connecticut’s 8-30g statute. While 8-30g projects can generate controversy, this one moved through the Planning and Zoning process with minimal opposition and was viewed positively by the Commission.

That outcome was not accidental.

A Measured Approach to 8-30g

Connecticut’s 8-30g statute allows developers to circumvent local zoning criteria in municipalities that have not met affordable housing thresholds. In many communities, applications push maximum height and unit counts, creating friction.

Benedict Place took a different path.

Selecting the right site and having pre-application conversations with regulators, the P&Z commission, and stakeholders drove a design responsive to its location. Redniss & Mead worked closely with Lonicera Partners, (Nimbus Properties was the initial developer.) land use counsel, and the broader consultant team to ensure that life safety, infrastructure capacity, and technical feasibility were addressed early and thoroughly.

Working alongside BKSK Architects and general contractor AP Construction, the team aligned design, engineering, and construction realities before formal review began. That early coordination shaped the tone of the approval process and reduced the potential for late-stage conflict.

 Building Within a Tight Urban Footprint

The site sits within a constrained downtown block. The building extends nearly property line to property line. A private roadway runs through the development and provides access to adjacent properties. Utilities serving surrounding buildings traverse the site.

Stormwater management required particular creativity. With little at-grade area available, the team incorporated green roof strategies and above-building rain gardens; however, that was not enough to fully meet the requirements of the Town of Greenwich Drainage Manual. An additional compact treatment system was designed to be integrated within a lower level parking structure.

Every square foot required coordination across disciplines.

Leading Interagency Coordination

Beyond site design, the project required steady engagement with multiple municipal departments.

Redniss & Mead led coordination with the fire marshal, utilities, sewer department, and engineering staff to confirm water supply, sewer capacity, and emergency access compliance. Infrastructure improvements were carefully documented and sequenced to support both the development and the surrounding properties.

By resolving technical questions before they became public concerns, the team helped prevent delays and build confidence with reviewers.

Planning and Zoning approval was secured within months of submission, and construction is currently underway.

A Downtown Project That Set a Tone

Benedict Place demonstrates that affordable housing under 8-30g can be delivered thoughtfully in Greenwich. The project did not rely solely on statutory leverage. It relied on technical preparedness, disciplined coordination, and a development team aligned around feasibility and responsibility.

In a dense urban setting with limited margin for error, careful engineering made the difference.